Monthly Building Safety Inspections

Enter building name and month and year for date of inspection, place a check in the box to verify inspection statement; enter remedial action as needed.

Exits Lights - Exits lights are checked to verify they are lit
Building Date of Inspection (MM/YY) Verify Inspection Statement Remedial Action
Emergency Lights - Emergency lights are tested to verify they will turn on without electricity
Building Date of Inspection (MM/YY) Verify Inspection Statement Remedial Action
Fire Extinguishers - Fire extinguisher inspection is verifying the hose is in good condition, the pin is in place, Annual Inspection Tag is current, proper mounting, sign in place, unobstructed access and pressure is in the green area. Enter OK and sign monthly inspection tag.
Building Date of Inspection (MM/YY) Verify Inspection Statement Remedial Action
All electrical panels are unobstructed with a 30" clearance, closed and latched, have switches labeled.
Building Date of Inspection (MM/YY) Verify Inspection Statement Remedial Action
Doors and stairs
Remedial Action
All exit doors are unobstructed
All stairways are unobstructed
All fire doors are unobstructed, not chocked open and are working properly

Inspector's signature: ______________________________________